Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 8 results ...

Al-Sudairi, A A and Al-Motairi, M S (2010) Multi objective land use allocation model using priority-based goal programming technique. Construction Management and Economics, 28(02), 61.

  • Type: Journal Article
  • Keywords: MOMRA; goal programming; land use; allocation
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446190903460698
  • Abstract:
    A multi-objective goal programming model was used to optimize land use allocation for housing projects in the Kingdom of Saudi Arabia. The main goal of this model is twofold. It is hoped, on the one hand, that it would reduce the effort and time in planning for such projects, as well as guarantee the element of accuracy on the other. The model utilized the planning standards and requirements set by the Ministry of Municipalities and Rural Affaires (MOMRA) in allocating land uses of various housing projects. Based on the results of the study, certain planning constraints were proved to be more sensitive than others as planners need to take into account essential factors such as population density and provision of private and semi-public facilities. In addition, linear goal programming models accompanied by prioritization usually fit the nature of land use allocation problems in housing projects. The result shows that a high level of optimization has been achieved.

Anagnostopoulos, K P and Koulinas, G K (2010) A simulated annealing hyperheuristic for construction resource levelling. Construction Management and Economics, 28(02), 75.

Loosemore, M, Phua, F, Dunn, K and Ozguc, U (2010) Operatives’ experiences of cultural diversity on Australian construction sites. Construction Management and Economics, 28(02), 88.

Lu, S-L and Sexton, M (2010) Career journeys and turning points of senior female managers in small construction firms. Construction Management and Economics, 28(02), 39.

McGuffin, A A and Obonyo, E (2010) Enhancing performance: a case study of the effects of employee coaching in construction practice. Construction Management and Economics, 28(02), 9.

Ökmen, Ö and Öztaş, A (2010) Construction cost analysis under uncertainty with correlated cost risk analysis model. Construction Management and Economics, 28(02), 12.

Tuuli, M M, Rowlinson, S and Koh, T Y (2010) Dynamics of control in construction project teams. Construction Management and Economics, 28(02), 202.

Ye, K, Shen, L and Tan, Y (2010) Response strategies to the competition in the Chinese construction market. Construction Management and Economics, 28(02), 24.